Solar Installation
Silobela, at Viki Farm 45km from Kwekwe
RAZ has just completed the Pre-Feasibility Study for this project, located at Silobela, at Viki Farm 45km from Kwekwe in the Midlands Province. The developers expressed interest to incorporate a Battery Energy Storage System (BESS) in the project, so as to have despatchable energy during the morning and evening peaks. The project will have a private off-taker, instead of the utility ZETDC, and RAZ will complete the Bankable Feasibility Study in February 2025.
+263 773 421 317
123 Bogward Road , Masasa, Harare.
Our mission is to provide clean, reliable, and affordable energy solutions across Africa, driving socio-economic development and environmental stewardship.
Copyright © 2024 Renewable Africa Zimbabwe. All rights reserved. Website designed by Line IT Consultancy.